30,000+ Projects
With 4,300 currently active projects, VDA's consultations reach the spectrum of end uses. From subways and airports to symphony halls, from venerated landmarks and hospitals to embassies...
VDA has impacted transportation in virtually all building environments. The firm has designed mail handling systems and has consulted for special equipment applications like rack and pinion elevators, double deck hydraulic elevators, turntables, and vehicle lifts.
Complying with ADA regulations, VDA professionals design and oversee maintenance for systems that represent efficiency, aesthetics, and safety, and - whether projects run several months or span years - provide clients with the innovation and superior service they expect.
Projects are sorted by year, from newest to oldest.
-
Mortimer B. Zuckerman Research Center, Memorial Sloan-Kettering Cancer Center
The Mortimer B. Zuckerman Research Center at the Memorial Sloan-Kettering Cancer Center is the first new research facility for MSKCC since 1989. One of the tallest laboratory buildings in the world, the 692,000 sq. ft. complex includes a 23-story building, completed in May 2006, that includes 16 modular laboratories, capable of being customized and reconfigured based on changing needs. The tower accommodates the Center’s programs in immunology, molecular pharmacology and chemistry, and cancer biology and genetics. A connecting 7-story structure that is under construction and scheduled for completion in 2008 will add a conference center, and a number of dry laboratories. The building was designed by Skidmore, Owings & Merrill, in collaboration with Zimmer Gunsul Frasca Partnership.
VDA provided full consulting services through construction administration for six (6) 23-stop gearless traction elevators; and eight (8) hydraulic elevators. Two (2) of the hydraulic elevators are dual roped single stage elevators serving 4 stops and 3 stops each; there is also a vivarium elevator and four (4) clean/dirty cars, all of which serve 2 stops; and a standard in-ground hydraulic elevator which will be installed in the connecting 7-story structure.
Project Info
Service Type
Client
Skidmore, Owings & Merrill, LLP, ZGF Architects LLP
Size
692,000sf
Project Type
Featured Projects, Healthcare
Equipment Type
Elevators
Location
New York, NY
Completion Year
2006
Cost
$414 Million
Key Personnel
Hakan Tanyeri Chief Operating Officer of New Construction
Contact Info
Hakan Tanyeri
Chief Operating Officer of New Construction
Headquarters: East Hanover
120 Eagle Rock Avenue
Suite 310
East Hanover, NJ 07936Phone: 973-994-9220
Fax: 973-994-9220