Archstone Clinton

VDA provided consulting services through construction administration for the vertical transportation equipment in this mixed-use project that includes loft- and conventional-style residential space, retail, and theaters in three buildings that surround a plaza with community space.

Tower 1 (25 stories) has three (3) geared traction elevators and a standard in-ground 3-stop hydraulic elevator. Tower 2 (25 stories) has three (3) geared traction elevators, a 2-stop holeless hydraulic elevator; a 4-stop dual roped holeless freight elevator, and a 3-stop dual roped holeless hydraulic passsenger elevator. There is also a geared traction elevator to serve the low-rise condo building.

Tags: leed

Project Info

Service Type

New Construction

Client

FxFowle Architects

Project Type

Residential

Equipment Type

Elevators

Location

New York, NY

Completion Year

2008

Cost

$170 Million

Key Personnel

Nicholas Lombardi Vice President, Engineering

Contact Info

Scott Schwamb
Senior Associate
New York
145 West 30th Street, 4th Floor
New York, NY 10001

Phone: 212-868-9090
Fax: 212-868-9090

sschwamb@vdassoc.com